Works on all 3rd corps: insulation of facades, followed by lining a stone, installation of window frames, lining of internal engineering networks (ventilation, drainage, water supply, heating system, the laying of power and low-voltage networks).

Fotosession March

Works on all 3rd corps: insulation of facades, followed by lining a stone, installation of window frames, lining of internal engineering networks (ventilation, drainage, water supply, heating system, the laying of power and low-voltage networks).

8 apartments for 8 March

Details of the action 8 apartments for March 8. Special prices for apartments in Level Barvikha Residence. Have time to buy an apartment in a unique residential complex! Especially for you, we launched an action of 8 apartments by March 8 with a discount of up to 7%. The offer is valid from 06 March 2017 to 06 April 2017.

The number of apartments is limited!
Sign up for a meeting with the manager in time to book a dream apartment.
The discount is not summed up with other shares, special conditions and does not apply to installments.
The offer is not a public offer.

OOO MasterStroy

INN 7702579021
KPP 770301001
OGRN 1057748481460
OKPO 78976156

Address of location: 123317, Moscow, Presnenskaya embankment, 6, building 2, room 5706.

Fotosession February

Works on all 3rd corps: insulation of facades, followed by lining a stone, installation of window frames, lining of internal engineering networks (ventilation, drainage, water supply, heating system, the laying of power and low-voltage networks).

Fotosession January

In the first photo Building 1, on the second photo housings 2, 3.